DISAmerica Consulting Group, Inc. has the technical and managerial resources and expertise needed to carry out engineering assignments.
Design, permitting and construction management services for new Aircraft Design Group (ADG) III Taxiway Connector at the Miami Executive Airport (TMB) between Taxiway A and D with an adjacent aircraft holding bay/engine.
Installation of 200 LF of 8” D.I.P. fireline with double detector check valve to service LATAM Cargo Building No. 709 (includes removal/disconnection to existing DDCV assembly) at Miami International Airport (landside) for LATAM Airlines.
Airside construction MOT/safety operational plans for temporary closure of Concourse gates to allow for pavement rehabilitation.